Bridge Surselva
Alte Rheinbrücke, Tavanasa
Today's bridge is still well reminiscent of Maillart's structural considerations. In the 19th century, it was considered a bridge construction achievement.
Beschreibung
Modern reinforced concrete bridge construction in Switzerland reached an early peak in the first two decades of this century thanks to Robert Maillart's pioneering achievements. It was only with the Tavanasa Bridge that Maillart succeeded in creating a design that consistently detaches itself from the models of stone construction and illustrates the hollowing out and dissolution of the building. A debris flow destroyed the building, which in 1905 already indicated the international style. Today's bridge is still well reminiscent of Maillart's structural considerations. In the 19th century, it was considered a bridge construction achievement.
(Text recorded by: Regiun Surselva)
Kontakt
Alte Rheinbrücke, Tavanasa
Via Principala 34, 7165 Brigels
Verantwortlich für diesen Inhalt Surselva Tourism.
Dieser Inhalt wurde automatisiert übersetzt.
Diese Webseite nutzt Technologie und Inhalte der Outdooractive Plattform.